Image 1

Adex Powers Grameen Telecom Trust with 3150 kVA Substation

Advanced Substation Infrastructure for Bangladesh’s Development Sector

Adex is proud to power progress with the successful installation of an 11/.415 kV, 3150 kVA Substation at Grameen Telecom Trust — a leading force in Bangladesh’s development sector.

Key Equipment Supplied & Installed by Adex

  • ✅ M.CT & PT
  • ✅ Bypass Panel
  • ✅ 3× Automatic Voltage Regulators (AVRs) — ensures stable voltage and protects sensitive equipment
  • ✅ Vacuum Circuit Breaker (VCB)
  • ✅ Transformers
  • ✅ LT & PFI Panel

This high-capacity and intelligently engineered substation ensures safe, efficient, and uninterrupted power distribution for one of the nation’s most respected development organizations.

“At Adex, we don’t just deliver electrical solutions — we safeguard performance and empower progress.” ⚡

📞 Get in Touch:

📧 info@adexbd.com | ☎️ +8801713-436286

🏢 Head Office: 374, Tejgaon I/A, Dhaka-1208, Bangladesh

📞 Phone: +88-02-41010439, 41010440

#AdexEngineering #GrameenTelecomTrust #SubstationSolution #PoweringProgress #BangladeshDevelopment #SmartPowerSystems #AdexProjects #ElectricalInfrastructure

Adex Logo

Contact

  • info@adexbd.com
  • +880 1713-164506, +88 02 41010439, 41010440
  • Head Office: 374 (4th & 5th Floor), Tejgaon I/A, Dhaka-1208
  • Factory: West Dogri, Bhawal Mirzapur, Gazipur, Bangladesh
© 2025 Adex Group™ — All Rights Reserved.