33/11 kV AIS Substation Upgradation – Khagrachari

Powering the Hills with Modern Infrastructure

As part of the Development Project of Power Distribution in Three Hilly Districts, Adex upgraded the existing 2×5 MVA AIS substation to 2×10/13.33 MVA capacity in Khagrachari, another significant undertaking under BPDB.

✅ Key Details:

  • Scope: Design, Supply, Construction, Testing & Commissioning
  • Substation Capacity Upgrade: From 2×5 MVA to 2×10/13.33 MVA
  • Location: Khagrachari District
  • Goal: To meet growing regional electricity demands and support industrial, residential, and governmental infrastructure in the hilly region

Strengthening National Infrastructure

These two projects reflect Adex’s capability in delivering high-voltage power infrastructure solutions that support the national vision for a digitized and modernized energy grid. With meticulous execution and cutting-edge engineering, Adex continues to play a pivotal role in shaping Bangladesh’s power distribution landscape.

Adex — Leading the transformation in power infrastructure.

📧 info@adexbd.com | 📞 +8801713-436286

📍 374, Tejgaon I/A, Dhaka-1208

#AdexGroup #BPDBProjects #FeniAISSubstation #KhagrachariPowerUpgrade #TurnkeySubstation #PowerDistributionBangladesh #ElectricalInfrastructure #PowerEngineering #33kVAIS #EnergyDevelopment #ModernSubstations #MadeInBangladesh

Adex Logo

Contact

  • info@adexbd.com
  • +880 1713-164506, +88 02 41010439, 41010440
  • Head Office: 374 (4th & 5th Floor), Tejgaon I/A, Dhaka-1208
  • Factory: West Dogri, Bhawal Mirzapur, Gazipur, Bangladesh
© 2025 Adex Group™ — All Rights Reserved.